Skip to content

Basement finishing in Toronto, Vaughan and the GTA

We frame, drywall, light and floor basements from our office in Thornhill. The first visit is free, and on it we look at three things before any design: the water, the ceiling height and the permit your city asks for.

Call 437-667-2121

15+ years of renovations in the GTA, 500+ projects, a reply within 24 hours.

Room with a small high window, wood slat wall panels, a warm LED strip along the ceiling, a white jetted tub and a light tile floor with tools on it
One of our rooms in progress. 1.95 m is the lowest ceiling Ontario allows in a basement second unit.

Dry first, then drywall

Once the walls are closed, nobody sees the foundation for years. So we check the floor drain, the foundation walls and the sump before anything is framed.

In Toronto the City pays part of the flood protection when a licensed plumbing or drain contractor puts it in.

What goes inThe City pays up toWhat it asks for
Backwater valve$1,600per valve, two at mostA building permit, and an inspection before the valve is covered
Sump pump$2,250No permit; photos of the pump and the pipe that drains it outside
Battery backup for the pump$300Paid on top of the sump pump amount
Cutting and capping the storm pipe$400Labour, materials and tax included

Amounts for work done on or after November 12, 2025. You apply within two years, and the City pays first come, first served. Source: City of Toronto, basement flooding protection subsidy program

Toronto and Vaughan ask for different permits

Toronto

  • No permit for a finish with no structural change, no new plumbing and no second unit.
  • A permit for new plumbing, a backwater valve, underpinning, a walkout entrance, or a window opening that is new, bigger or moved.
  • A permit for a second suite.

Vaughan

  • A permit for finishing basement areas, even with no plumbing at all.
  • A permit for new plumbing fixtures or for moving the ones you have.
  • A separate permit if a secondary suite goes in.
  • The owner may draw the plans, or a designer with a BCIN can sign them.

Sources: City of Toronto, when do I need a building permit · City of Vaughan, finishing a basement.

What Vaughan wants to see on the basement drawing

A fully dimensioned plan, signed and dated. If you have the house plans or a survey, bring them to the free visit.

  1. The name of each room and what it will be used for
  2. Window and door sizes
  3. The bathroom layout
  4. New plumbing fixtures and any that move
  5. Where the stairs and the furnace are
  6. How the new walls are built, with insulation values
  7. New beams, their size and what holds them
  8. Ceiling heights

From our jobs

Two small high windows set into wood slat wall panels, an LED strip lighting the edge of a white ceiling, and a white jetted tub not yet hooked up
Slat panels taken around two high windows, with the LED strip run along the ceiling line.
Looking down a staircase from a marble tiled floor: the treads are under protection board and tape, with drywalled walls on the floor below
A stair down to the lower floor, treads covered while the drywall below gets finished.
Grey plaster feature wall edged with green tape, with openings cut for wiring and a floor covered in protection paper
A grey plaster feature wall, with the boxes for the wiring cut before it was finished.

Making the basement a second unit

1.95 m

The minimum ceiling height in a basement unit, which is 6' 4¾".

30 min

Fire separation between the two units, or 15 minutes if the whole house has interconnected smoke alarms.

S531

The CAN/ULC standard every smoke alarm has to meet. One goes on each level and in each bedroom of the unit.

ESA

The unit's wiring needs its own electrical permit and an inspection by the Electrical Safety Authority.

Zoning comes before all of it: if the lot can't meet your city's by-law, it can't have a second unit. And since January 1, 2026, a house with a fuel-burning appliance, a fireplace or an attached garage needs a carbon monoxide alarm on every storey, the basement included.

Sources: Ontario, add a second unit in your house · Ontario, carbon monoxide safety

“We were very pleased with the renovation of our basement in Richmond Hill, ON. Everything was done professionally, with quality and on time. I recommend this company.”

Roman Chornyi, Google review
Read our reviews on Google

Questions people ask about finishing a basement

Do I need a permit to finish a basement in Toronto?

Not for walls, floors and lighting alone. New plumbing, a structural change, a new window opening, a walkout or a second unit each need one.

How high does the ceiling have to be for a basement apartment?

At least 1.95 m, or 6' 4¾", under Ontario's rules for a second unit.

Does the City of Toronto help pay for a backwater valve?

Yes, up to $1,600 per valve for work done since November 12, 2025, when a licensed contractor installs it under a building permit.

Book the free visit for your basement

Call 437-667-2121, write to info@artstyleconstruction.ca or use the form. It helps if you send:

  • photos of the ceiling, the furnace corner and the floor drain;
  • the city the house is in;
  • whether you want a bathroom down there, or a separate unit.

Send us a message

We reply within 24 hours. Free, no-obligation consultation.

Call Now