Bathroom renovations · Toronto & the GTA
Bathroom Renovations in Toronto & the GTA
Showers, tubs, vanities, tile and lighting, done by one crew from our Thornhill office.
- 15+years of renovations in the GTA
- 500+finished projects
- 24 hto answer your message
- Freevisit to your home before the quote


Three bathrooms, three kinds of shower



One bathroom, five photos
A tub in the bay window, a shower beside it
The same room, from the shower to the window.

Vertical tile, a niche and a pebble floor in the shower.

A walnut vanity on black legs under a backlit mirror.

Vanity, shower, toilet and tub in one view.

A freestanding tub in the three-window bay.

The tub filled; the shower and toilet behind it.
Google reviews
From clients whose bathrooms we renovated
“Outstanding service! My bathroom remodel was completed right on schedule, and the workspace was kept spotless throughout. Art and his team were a pleasure to communicate with and consistently went the extra mile to ensure everything was done right. Thank you, guys”
Levancho · bathroom remodel
“Amazing service, very professional, renovated my washroom! Great prices!”
Diana Imanzhanova · washroom renovation
Permits
Moving a drain takes a permit; swapping a toilet does not
| City | Needs a permit | No permit |
|---|---|---|
| Toronto | New or changed plumbing; a backwater valve; moving walls | Repairing or replacing fixtures such as a toilet or faucet |
| Vaughan | Adding or altering plumbing fixtures; pipes stay uncovered until the final inspection | Not listed |
| Markham | Any plumbing work, even a fixture alone | A separate plumbing permit inside a larger project |
| Richmond Hill | Altering plumbing | Building bathroom cupboards |
Fans, heated floors, lit mirrors
- Wiring them is electrical work: in Ontario, hire only a Licensed Electrical Contractor, who notifies the ESA.
- Keep the Certificate of Acceptance; an insurer or a sale may require it.

Another bathroom, mid-installation
Before the vanity top goes on
The vanity boxes hang without a top, the shower glass is in, and a wire waits in the bare wall. Check now:
- Where that wire sits for the mirror or light.
- That open drawers clear the toilet.
- The sink positions before the top is cut.
Lighting in the shower, at the mirror and under the vanity
Each needs power at that spot before the walls are tiled.
Lit corner nicheA recessed shelf around the shower corner, lit along its top.
Backlit mirrorA wide mirror with a lit edge over a walnut double vanity and wave-pattern tile.
Light under the vanityA strip under a navy double vanity that lights the floor at night.
Waterproofing
Three shower membranes, as their makers describe them
Schluter KERDI
- What it is
- A fleece-faced polyethylene sheet set in thin-set.
- When tile can go on
- Straight away, no waiting period.
LATICRETE HYDRO BAN
- What it is
- A liquid in two coats that dries olive green.
- Flood test
- Two hours after the second coat at 21 °C; 24 hours at 10–21 °C.
MAPEI AquaDefense
- What it is
- Premixed liquid rubber; fabric reinforces corners and drains.
- When tile can go on
- After 30–50 minutes; flood test after 12 hours.
Sources: Schluter KERDI · LATICRETE HYDRO BAN · MAPEI AquaDefense data sheet
Questions
Bathroom renovation FAQ
Do I need a permit to replace a toilet or vanity in Toronto?
No. Replacing plumbing fixtures needs no permit; adding or moving plumbing does.
Does turning a tub into a walk-in shower need a permit?
Yes, if the drain moves: that changes the plumbing system.
Who wires the exhaust fan or a heated floor?
A Licensed Electrical Contractor, who notifies the ESA of the work.
How soon can tile go on the waterproofing?
On Schluter KERDI, right away. On MAPEI AquaDefense, after 30–50 minutes.
How quickly will you get back to me?
Within 24 hours, and the first visit to your home is free.
Start here
Tell us about your bathroom
Send a few photos of the room, its rough size, and whether the tub stays or becomes a shower.
Send us a message
We reply within 24 hours — free, no-obligation consultation.